The public utility may temporarily disconnect the small generator facility from its EDS at any time and for as long as reasonably necessary in the event of an interruption caused by adverse operating conditions.
If the public utility determines that operation of the small generator facility will likely cause disruption or deterioration of service to other customers served from the same electric system, or if operating the small generator facility could cause damage to the public utility's EDS, the public utility may disconnect the small generator facility under the procedures of this section.
The public utility shall provide the interconnection customer any supporting documentation used to reach the decision to disconnect upon request.
The interconnection customer shall remedy the adverse operating effect as soon as possible. The public utility may withhold interconnection services until the adverse effects are eliminated.
S.D. Admin. R. 20:10:36:69
General Authority: SDCL 49-34A-27, 49-34A-93.
Law Implemented: SDCL 49-34A-27, 49-34A-93.