The public utility may propose to interconnect more than one small generator facility at a single point of interconnection in order to minimize costs, and may not unreasonably refuse a request to do so. However, an applicant or an interconnection customer may elect to pay the entire cost of separate interconnection facilities.
S.D. Admin. R. 20:10:36:14
General Authority: SDCL 49-34A-27, 49-34A-93.