S.D. Admin. R. 12:82:06:05

Current through Register Vol. 51, page 67, December 16, 2024
Section 12:82:06:05 - Grower Pre-harvest inspection procedures

The grower licensee must contact the Department at least 10 days prior to harvest in order to schedule an inspection. If the grower licensee or a key participant fails to be present at the scheduled inspection, a second request for inspection must be made to the Department. Failure to harvest the crop within 30 days after the lot was sampled requires a resampling for total THC concentration or issuance of an order of destruction by the Department.

S.D. Admin. R. 12:82:06:05

47 SDR 075, effective 12/28/2020; 49 SDR 047, effective 11/22/2022

General Authority: SDCL 38-35-11(4)(9).

Law Implemented: SDCL 38-35-10.