S.D. Admin. R. 12:82:06:02

Current through Register Vol. 51, page 67, December 16, 2024
Section 12:82:06:02 - Planting verification inspection - Nonconforming lots

Within thirty days of planting, each grower licensee shall file with the Department documentation to identify the type and variety of each industrial hemp seed, seedling, or clone planted with its corresponding lot. Upon receipt of this documentation, a planting verification inspection may be scheduled by the Department. This inspection will verify the geospatial coordinates of the lots and legal description, address, location ID, and acreage and square footage planted. The grower licensee or a key participant, shall be present at the inspection. Any growing sites that do not conform to the license must be destroyed, or the license must be amended.

S.D. Admin. R. 12:82:06:02

47 SDR 075, effective 12/28/2020; 49 SDR 047, effective 11/22/2022

General Authority: SDCL 38-35-11(9).

Law Implemented: SDCL 38-35-8, 38-35-9.