Section 10:09:01:01 - Definitions Terms used in this article mean:
(1) A/E, the architect or engineer of record;(2) Baseline, minimum of all building construction industry standards or recommended practices;(3) Basis of design, the information necessary to accomplish the owners project requirements, including: system descriptions; indoor environmental quality criteria; design assumptions; and references to applicable codes, standards, regulations, and guidelines;(4) Building certificate, the building certificate issued by the rating system administrator;(5) Building certification document, all documentation verifying building project certification;(6) Building contractor, the contractor hired in accordance with SDCL chapter 5-18;(7) Commissioning team, includes people responsible for working together to carry out the commissioning process;(8) Construction document phase, the phase of the A/Es services in which the A/E prepares plans and specifications and final bidding documents for submission to the owner for the owners approval;(9) Design development phase, the phase of the A/Es services in which the A/E prepares from the approved schematic design studies the design development documents including: detailed material types, locations of windows and doors, and the construction cost estimate, for submission to the owner for the owners approval;(10) High performance building standard checklist, a document approved by the rating system administrator and the OSE showing at a minimum each point or criteria to be evaluated, its status, and an explanation of the A/Es reasoning for choosing or dismissing the point;(11) OSE, The Office of the State Engineer within the Bureau of Administration;(12)Owner, owner of the state building project to include the Board of Regents, any state agency, department, or institution;(13) Owners project requirements, a written document that details the ideas, concepts, and criteria determined by the owner to be important to the success of the project;(14) Programming phase, the phase of the A/Es services in which the scope of the work and building project programming are defined;(15) Schematic design phase, the phase of the A/Es services which includes: drawings of the site plans, floor plans, images, overall dimensions, and a construction estimate for submission to the owner for the owners approval;(16) Simple payback, measurement of the elapsed time between initial investment and the amount of time required for positive cash flows to equal the total investment costs;(17) Rating system administrator, the organization responsible for the development and administration of the rating system.S.D. Admin. R. 10:09:01:01
34 SDR 323, effective 7/3/2008; 41 SDR218, effective 6/30/2015.General Authority: SDCL 5-14-38.
Law Implemented: SDCL 5-14-38.