S.D. Admin. R. 10:09:01:01

Current through Register Vol. 51, page 67, December 16, 2024
Section 10:09:01:01 - Definitions

Terms used in this article mean:

(1) A/E, the architect or engineer of record;
(2) Baseline, minimum of all building construction industry standards or recommended practices;
(3) Basis of design, the information necessary to accomplish the owners project requirements, including: system descriptions; indoor environmental quality criteria; design assumptions; and references to applicable codes, standards, regulations, and guidelines;
(4) Building certificate, the building certificate issued by the rating system administrator;
(5) Building certification document, all documentation verifying building project certification;
(6) Building contractor, the contractor hired in accordance with SDCL chapter 5-18;
(7) Commissioning team, includes people responsible for working together to carry out the commissioning process;
(8) Construction document phase, the phase of the A/Es services in which the A/E prepares plans and specifications and final bidding documents for submission to the owner for the owners approval;
(9) Design development phase, the phase of the A/Es services in which the A/E prepares from the approved schematic design studies the design development documents including: detailed material types, locations of windows and doors, and the construction cost estimate, for submission to the owner for the owners approval;
(10) High performance building standard checklist, a document approved by the rating system administrator and the OSE showing at a minimum each point or criteria to be evaluated, its status, and an explanation of the A/Es reasoning for choosing or dismissing the point;
(11) OSE, The Office of the State Engineer within the Bureau of Administration;
(12)Owner, owner of the state building project to include the Board of Regents, any state agency, department, or institution;
(13) Owners project requirements, a written document that details the ideas, concepts, and criteria determined by the owner to be important to the success of the project;
(14) Programming phase, the phase of the A/Es services in which the scope of the work and building project programming are defined;
(15) Schematic design phase, the phase of the A/Es services which includes: drawings of the site plans, floor plans, images, overall dimensions, and a construction estimate for submission to the owner for the owners approval;
(16) Simple payback, measurement of the elapsed time between initial investment and the amount of time required for positive cash flows to equal the total investment costs;
(17) Rating system administrator, the organization responsible for the development and administration of the rating system.

S.D. Admin. R. 10:09:01:01

34 SDR 323, effective 7/3/2008; 41 SDR218, effective 6/30/2015.

General Authority: SDCL 5-14-38.

Law Implemented: SDCL 5-14-38.