S.C. Code Regs. § § 8-918

Current through Register Vol. 48, No. 11, November 22, 2024
Section 8-918 - IFC 2303.2.2 Testing

Emergency disconnect switches shall be tested annually by the responsible party to ensure proper operation; records of testing shall be maintained on site for inspection. Any switches determined to be faulty, the fuel pumps they serve shall be taken out of service until the emergency shutoff switch is placed back into service.

S.C. Code Regs. § 8-918

Added by State Register Volume 37, Issue No. 6, eff June 28, 2013; State Register Volume 43, Issue No. 05, eff. 5/24/2019; State Register Volume 44, Issue No. 06, eff. 6/26/2020; State Register Volume 46, Issue No. 05, eff. 5/27/2022.