S.C. Code Regs. § § 72-445

Current through Register Vol. 48, No. 11, November 22, 2024
Section 72-445 - Inspection and Enforcement
A. The Commission may periodically inspect land disturbing activities performed pursuant to the plan required by this regulation. In the event the Commission finds that the measures in the plan are not adequate to control erosion, retain sediment on the site and manage stormwater in a manner that neither any on-site nor off-site damage or problem is caused or increased, it shall require that necessary additional measures be implemented.
B. Upon completion, the Department shall notify the Commission of the completion and acceptance of the project.
C. In the event the Commission finds that a land disturbing activity is not being performed in accordance with the submitted stormwater management and sediment control plan, the Commission may issue a written order either directing conformance with the plan, suspending additional work until conformance is achieved, or directing other measures that it deems necessary to control erosion, retain sediment on the site and manage stormwater in a manner that neither any on-site nor off-site damage or problem is caused or increased.
D. Complaints from any party shall be investigated by the Commission.

S.C. Code Regs. § 72-445

Added by State Register Volume 17, Issue No. 5, Part 3, eff May 28, 1993.