S.C. Code Regs. § § 61-62.99.B.43

Current through Register Vol. 48, No. 11, November 22, 2024
Section 61-62.99.B.43 - Standard requirements
(a) For the control period that begins on May 31, 2004, an owner or operator of any Portland cement kiln subject to this rule shall not operate the kiln during May 31 through September 30 unless the kiln has installed and operates during May 31 to September 30 with low-NOx burners, mid-kiln firing, or alternative control techniques, as defined under Section99.42(a)(a). In all subsequent control periods, an owner or operator of any Portland cement kiln subject to this rule shall not operate the kiln during May 1 through September 30 unless the kiln has installed and operates during May 1 to September 30 with low-NOx burners, mid-kiln firing, or alternative control techniques, as defined under Section99.42(a)(a).

S.C. Code Regs. § 61-62.99.B.43

Added by State Register Volume 26, Issue No. 5, Part 1, eff May 24, 2002. Amended by State Register Volume 36, Issue No. 6, eff June 22, 2012 (errata).