885 R.I. Code R. 885-RICR-00-00-3.2

Current through December 3, 2024
Section 885-RICR-00-00-3.2 - TIER I Fees - Minor Projects

This fee schedule applies to determinations of consistency of use, hearing panel review, and alterations, additions and new construction with an estimated construction cost of one hundred thousand dollars ($100,000.00) or less. Project costs shall be determined by the Executive Director but shall exclude site acquisition, remediation, and site preparation costs.

3.2.1Certification of Consistency of Use and Hearing Panel Review
A. The fee for a certificate of consistency of use is one hundred dollars ($100.00).
B. The fee for Hearing Panel and Waterfront Commission hearings for conditional use and deviations for a project without alterations, additions or construction is two hundred dollars ($200.00).
3.2.2Alterations, Additions and Construction
A. The project fee for project costs up to five thousand dollars ($5,000.00) is fifty dollars ($50.00).
B. The project fee for project costs from five thousand dollars ($5,000.00) to nine thousand nine hundred ninety-nine dollars ($9,999.00) is one hundred dollars ($100.00).
C. The project fee for project costs from ten thousand dollars ($10,000.00) to forty-nine thousand nine hundred ninety-nine dollars ($49,999.00) is two hundred fifty dollars ($250.00).
D. The project fee for project costs from fifty thousand dollars ($50,000) to ninety-nine thousand nine hundred ninety-nine dollars ($99,999.00) is five hundred dollars ($500.00).

885 R.I. Code R. 885-RICR-00-00-3.2

Adopted effective 7/1/2019
Amended effective 10/19/2020