Project applicants are only required to submit a change order to the PA for approval if the changes significantly alter an already approved measure or otherwise may affect the energy consumption of the building.
830 R.I. Code R. 830-RICR-10-05-2.9
Project applicants are only required to submit a change order to the PA for approval if the changes significantly alter an already approved measure or otherwise may affect the energy consumption of the building.
830 R.I. Code R. 830-RICR-10-05-2.9