RI C-PACE requires a post completion inspection report and post-construction commissioning report.
830 R.I. Code R. 830-RICR-10-05-2.15
RI C-PACE requires a post completion inspection report and post-construction commissioning report.
830 R.I. Code R. 830-RICR-10-05-2.15