Required documents: | Required contents: | Other requirements: |
(1) Cover letter | (i) Proposed facility designations; | The applicant shall submit |
(ii) The type of facility | four (4) paper copies and one (1) electronic copy. | |
(2) Location | (i) Latitude and longitude coordinates, Universal Mercator grid-system coordinates, state plane coordinates in the Lambert or Transverse Mercator Projection System; (ii) These coordinates shall be based on the NAD (North American Datum) 83 datum plane coordinate system; and (iii) The location of any proposed project easement. | The applicant's plat shall be drawn to a scale of 1 inch equals 100 feet and include the coordinates of the project site, and boundary lines. The applicant shall submit four (4) paper copies and one (1) electronic copy. |
(3) Front, Side, and Plan View drawings | (i) Facility dimensions and orientation; (ii) The type of facility (iii) Pile sizes and penetration. | The applicant's drawing sizes shall not exceed 11" x 17". The applicant shall submit four (4) paper copies and one (1) electronic copy. |
(4) Complete set of structural drawings | The approved for construction fabrication drawings should be submitted, including, e.g., (i) Cathodic protection systems; (ii) Jacket design; (iii) Pile foundations; (iv) Mooring and tethering systems; (v) Foundations and anchoring systems; and (vi) Associated cable and pipeline designs. | The applicant's drawing sizes shall not exceed 11" x 17". The applicant shall submit four (4) paper copies and one (1) electronic copy. |
(5) Summary of environmental data used for design | A summary of the environmental data used in the design or analysis of the facility. Examples of relevant data include information on: (i) Extreme weather; (ii) Seafloor conditions; and (iii) Waves, wind, currents, tides, temperature, sea level rise projections, snow and ice effects, marine growth, and water depth. | The applicant shall submit four (4) paper copies and one (1) electronic copy. If the applicant submitted these data as part of the SAP or COP, the applicant may reference the plan. |
(6) Summary of the engineering design data | (ii) The type of facility (ii) The type of facility (iii) Location of foundation boreholes and foundation piles; and (ii) The type of facility | The applicant shall submit four (4) paper copies and one (1) electronic copy. |
(7) A complete set of design calculations | Self-explanatory. | The applicant shall submit four (4) paper copies and one (1) electronic copy. |
(8) Project-specific studies used in the facility design or installation | All studies pertinent to facility design or installation, (e.g., oceanographic and soil reports) | The applicant shall submit four (4) paper copies and one (1) electronic copy. |
(9) Description of the loads imposed on the facility | (i) Loads imposed by jacket; (ii) Turbines; (iii) Transition pieces; (iv) Foundations, foundation pilings and templates, and anchoring systems; and (v) Mooring or tethering systems. | The applicant shall submit four (4) paper copies and one (1) electronic copy. |
(10) Geotechnical report | A list of all data from borings and recommended design parameters. | The applicant shall submit four (4) paper copies and one (1) electronic copy. |
Required documents: | Required contents: | Other requirements: |
(1) Cover letter | (i) Proposed facility designation; (ii) Area, name, and block number; and (iii) The type of facility | The applicant shall submit four (4) paper copies and one (1) electronic copy. |
(2) Schedule | Fabrication and installation. | The applicant shall submit four (4) paper copies and one (1) electronic copy. |
(3) Fabrication information | The industry standards the applicant shall use to ensure the facilities are fabricated to the design criteria identified in the facility design report. | The applicant shall submit four (4) paper copies and one (1) electronic copy. |
(4) Installation process information | Details associated with the deployment activities, equipment, and materials, including offshore and onshore equipment and support, and anchoring and mooring permits. | The applicant shall submit four (4) paper copies and one (1) electronic copy. |
(5) Federal, State, and local permits (e.g., EPA, Army Corps of Engineers) | Either one (1) copy of the permit or information on the status of the application. | The applicant shall submit four (4) paper copies and one (1) electronic copy. |
(6) Environmental information | (i) Water discharge; (ii) Waste disposal; (iii) Vessel information; and (iv) Onshore waste receiving treatment or disposal facilities. | The applicant shall submit four (4) paper copies and one (1) electronic copy. If the applicant submitted these data as part of the SAP or COP, the applicant may reference the plan. |
(7) Project easement | Design of any cables, pipelines, or facilities. Information on burial methods and vessels. | The applicant shall submit four (4) paper copies and one (1) electronic copy. |
650 R.I. Code R. 650-RICR-20-05-11.9