Project Type | Preliminary Determination | Application to Alter |
1) Projects associated with developed individual residential lots, e.g., additions, garages, decks, sheds, pools, tennis courts, walls, landscaping; OWTS, new wells, new utility lines, etc. | $150.00 | $300.00 |
2) Construction of new individual residential lots, e.g., new single family dwellings and duplexes, and all associated utilities, OWTS, wells, garages, driveways, landscaping, sheds, pools, etc. | $450.00 | $900.00 |
3) Limited projects associated with developed apartments, condominiums, offices, schools, churches and commercial/individual lots, e.g., additions, garages, decks, sheds, pools, tennis courts, walls, landscaping; OWTS, new wells, new utility lines, parking areas. | $300.00 | $600.00 |
4) Construction of new apartments, condominiums, offices, schools, churches, commercial/industrial projects, including all associated site amenities, utilities and infrastructure, where all proposed work is confined to existing developed areas (buildings, parking areas, pavement, lawn) and where the 'total project area'* is: | ||
a) less than 1 acre; | $450.00 | $900.00 |
b) 1 acre to 4 acres; | $900.00 | $1800.00 |
c) greater than 4 acres to 20 acres; | $1800.00 | $3600.00 |
d) greater than 20 acres. | $3600.00 | $4500.00 |
For proposed projects within Providence, Pawtucket, Central Falls, Newport, and Woonsocket and for properly certified Growth Center projects (when a copy of the certification is submitted with the wetland application and fee): * The 'total project area' is that land area enclosed within the limit of disturbance as described in § 2.7(C)(12)(c) of this Part. | The fee is 25% less than the applicable fee in a-d above. | The fee is 25% less than the applicable fee in a-d above. |
5) Construction of new apartments, condominiums, offices, schools, churches, commercial/industrial lots including all associated site amenities, utilities and infrastructure, on undeveloped property or where work is not confined to existing developed areas and where the 'total project area' is: | ||
a) less than 1 acre; | $750.00 | $1500.00 |
b) 1 acre to 4 acres | $1500.00 | $3000.00 |
c) greater than 4 acres to 20 acres; | $3000.00 | $6000.00 |
d) greater than 20 acres. | $6000.00 | $75000.00 |
* The 'total project area' is that land area enclosed within the limit of disturbance as described in § 2.7(C)(12)(c) of this Part | ||
6) New subdivisions and multiple lot projects (including residential, commercial, and industrial development) with all associated infrastructure: | ||
2 lots | $900.00 | $1800.00 |
3 lots | $1200.00 | $2700.00 |
4 or 5 lots | $1500.00 | $3000.00 |
each additional lot* | $175.00 | $250.00 |
*The maximum total fee for any new subdivision is | $6500.00 | $10,500.00 |
7) Miscellaneous separate projects: | ||
a) (1) Individual docks, floats; (2) Wildlife habitat project or water quality improvement project; (3) Dry hydrants, (4) Wetland restoration project | $100.00 | $300.00 |
b) (1) Land redevelopment/reuse projects limited to conversion of sand and gravel banks, mill sites, abandoned commercial/industrial property to public recreation facilities; (2) Rehabilitation of existing parks or recreational areas of any size or new parks less than or equal to 4 acres; (3) Multiple docks, floats, or individual boat launches; (4) Pedestrian trails, paths, foot bridges; (5) Irrigation projects, subdrains; (6) Low hazard dam repairs; and (7) Dam removal projects. | $300.00 | $750.00 |
c) (1) Wells other than for single family house lots; (2) New pond construction; (3) New or replacement drainage structures/facilities, e.g., culverts and detention basins; and (4) Aquatic plant control projects. If done pursuant to a lake management plan in accordance with guidance prepared by the Department, the fee will be reduced by 50%. | $600.00 | $1500.00 |
d) (1) Construction of all new dams; | $600.00 | $2000.00 plus $200.00/acre impoundment |
e) (1) New parks or recreational areas where the total project area is greater than 4 acres; (2) Land clearing and/or grading operations; (3) Industrial processing/cooling, hydroelectric projects; and (4) Bike paths. | $1200.00 | $4000.00 |
f) (1) Surface mining, e.g. gravel quarry; and (2) New golf courses: | $6500.00 | $10,500.00 |
g) River/stream relocation and/or channelization: | $10.00/linear ft. | $50.00/linear ft. |
(1) River/stream length to be altered | $6.00/linear ft. | $25.00/linear ft. |
(2) Area subject to storm flowage to be alterered | To maximum of $20,000.00 | To maximum of $20,000.00 |
h) Other new construction, reconstruction, demolition, or modification projects not otherwise listed above; | $1200.00 | $4000.00 |
8) Fees based on estimated construction costs, (see §§ 2.7(J)(3) and (4) of this Part for how ECC is computed), including all associated drainage systems/facilities, bridges and utilities. (a) Reconstruction of existing or approved roads, railways, or airport facilities: | ||
(i) Less than or equal to $200,000.00 | $1000.00 | $2000.00 |
a. Greater than $200,000.00 but less than $500,000.00 | $2000.00 | $3000.00 |
b. Greater than $500,000.00 but less than $1,000,000.00 | $3000.00 | $4000.00 |
c. Greater than $1,000,000.00 | $6000.00 | $8000.00 |
(b) New road, railway, or airport facility construction: | ||
(i) Less than or equal to $200,000.00 | $2000.00 | $4000.00 |
(ii) Greater than $200,000.00 but less than $500,000.00 | $4000.00 | $7000.00 |
(iii) Greater than $500,000.00 but less than $1,000,000.00 | $6000.00 | $10,000.00 |
(iv) Greater than $1,000,000.00 | $8000.00 | $20,000.00 |
(c) New utility installation not exempt under § 2.6(J) of this Part | ||
(i) Less than or equal to $200,000.00 | $800.00 | $2,000.00 |
(ii) Greater than $200,000.00 but less than $500,000.00 | $1,500.00 | $3000.00 |
(iii) Greater than $500,000.00 but less than $1,000,000.00 | $2,000.00 | $4,000.00 |
(iv) Greater than $1,000,000.00 | $4,000.00 | $6,000.00 |
650 R.I. Code R. 650-RICR-20-00-2.7