Exception: As modified in Part 904.0 for historical buildings.
Exception: Minor reductions in the clear opening dimensions of replacement doors and windows that result from the use of different materials shall be allowed, unless such reductions are prohibited by ADAAG.
Exceptions:
Existing structural components supporting renovation work shall comply with this section. B
Where replacement of roofing or equipment results in additional dead loads, structural components supporting such re-roofing or equipment shall comply with the vertical load requirements of the Building Code. B
Exceptions:
Where roofing materials are removed from more than fifty (50%) percent of the roof diaphragm of a building or section of a building where the roof diaphragm is a part of the main wind force resisting system the integrity of the roof diaphragm shall be evaluated and if found deficient due to insufficient or deteriorated connections such connections shall be provided or replaced. B
Exception: The installation of new elevators shall comply with 501.3.
NOTE: Where the section is followed by the letter "B", "F", or "O", the following meaning shall apply:
"B" This means that the Building Official or the Plumbing, Mechanical or Electrical Inspector shall review the plans, issue the permit, inspect the installation, and approve the final certificate.
"F" This means that the Fire Official shall review the plans for approval, the Fire Official and/or the Building Official inspects the installation, and the Fire Official observes the final test and approves the final installation. The Building Official shall issue the permits.
"O" This would indicate another State agency approval and inspection is needed. An explanation will indicate the agency and approvals needed.
510 R.I. Code R. 510-RICR-00-00-20.4