Current through December 3, 2024
Section 300-RICR-00-00-1.9 - ApplicationsA. All application periods are to be established and scheduled by OER, in consultation with RIIB, provided that at least one application period shall be commenced per calendar year. 1. The duration of an application period shall be at least fourteen (14) calendar days.B. Notice of each application period must be posted on the websites of RIIB (www.riib.org) and OER (www.energy.ri.gov) at least ten (10) calendar days in advance of the commencement of the application period. At a minimum, the notice shall contain the date the application period will open, the date the application period will close, and provide the office address and/or website address where a prospective applicant can access the application.C. OER will issue one PPL for each application period.300 R.I. Code R. 300-RICR-00-00-1.9