300 R.I. Code R. 300-RICR-00-00-1.13

Current through December 3, 2024
Section 300-RICR-00-00-1.13 - Reporting Requirements
A. All recipients of financing from the Efficient Buildings Fund are required to comply with all OER data and reporting requests for at least five (5) years following project completion, including, but not limited to, the requirements specified below:
1. Actual number of full time equivalent jobs for the project;
2. Job types;
3. Entity-wide energy consumption compared to baseline consumption that was submitted in the Efficient Buildings Fund PPL application;
4. For energy efficiency projects, comparison of actual units of energy (e.g. kWh, therms, gallons) saved versus estimated units of energy saved based on the project application submitted;
5. For renewable energy projects, accessibility to the project production dash- boards (Locus, Solectria, etc.);
B. Reporting for all other eligible projects shall be determined as necessary.

300 R.I. Code R. 300-RICR-00-00-1.13