Current through November 7, 2024
Section 260-RICR-30-05-3.6 - RequirementsA. All contract shops must meet the standards for industrial operation as may be established by federal statutes, the laws of this state and the ordinances of its political subdivisions. In addition such contract shop shall supply adequate light, heat, ventilation and toilet facilities.B. Where zoning laws permit, a contract shop may be located in any building that does not have an entrance or other means of access to a house or other structure used as a residence. Access to the contract shop must be gained only by a separate entrance.C. The operator of a contract shop must notify the Director of Labor within five business days of a change of location of the contract shop, and obtain another permit for the new location.D. All duly registered contract shops must post the current permit in a conspicuous place where it may readily be viewed during an inspection of the premises by a duly authorized representative of the Director of Labor.E. All suppliers of goods to contract shops are subject to all provisions of R.I. Gen. Laws Chapter 28-18.F. All suppliers' invoices for contracted work shall bear the permit number of the contract shop.G. Failure to adhere to any of the above regulations may result in denial or revocation of a permit.260 R.I. Code R. 260-RICR-30-05-3.6