Written procedures outlining required calibration, annual maintenance, monitoring for proper function, and controlled procedures for use shall be established and followed for all equipment, apparatuses, and devices used in the preparation of CSPs. Results from calibration, annual maintenance reports, and routine maintenance shall be kept on file for the lifetime of the equipment.
216 R.I. Code R. 216-RICR-40-15-1.7
Amended effective 12/8/2022