Current through Register Vol. 54, No. 45, November 9, 2024
Section 181.21 - Submission of information to the Commission(a) At the beginning of each meeting or at any other time as requested by the Commission, every licensed racing entity shall furnish the following information to the Commission: (1) The current name and experience of the licensed racing entity's management employees and racing officials;(2) Racetrack facility maintenance records;(3) A report and certificate by a duly licensed civil engineer, land surveyor or other racetrack consultant that the racetrack has been properly measured from wire to wire;(4) A report and certificate by a duly licensed civil engineer, land surveyor or other racetrack consultant evidencing the accurate measurement and survey of the turns of the racetrack oval;(5) Detailed information regarding the racetrack's surface, materials and depth, maintenance records and information relating to the drainage system for the racetrack;(6) The design and construction of the pylons, including the use of the lightening lane or the removal of the pylons must be approved by the Commission;(7) Names of the racetrack personnel hired to maintain the track surface and a list of the necessary equipment, including any back-up equipment for maintaining the track surface.(b) Prior to the first day of a race meeting, a licensed racing entity shall deliver to the Commission a copy of the fire marshal's certification regarding the licensed racing entity's compliance with fire safety regulations or the fire marshal's plan of correction, if applicable. The certification or plan must be based on an inspection of the racetrack grounds conducted by the fire marshal not more than 30 days before the first day of a race meeting.(c) All detailed security and operational plans for the upcoming meet. This section cited in 7 Pa. Code § 181.57 (relating to racetrack surface).