Current through Register Vol. 54, No. 45, November 9, 2024
Section 495.7 - Temporary use of right-of-way(a)General rule. The district engineer shall be authorized to permit temporary use by public agencies and charitable organizations of right-of-way not required for free movement of traffic.(b)Duration. A permit for temporary use of right-of-way may not exceed 90 days' duration.The provisions of this §495.7 adopted May 9, 1975, effective 5/10/1975, 5 Pa.B. 1230; readopted August 5, 1988, effective 8/6/1988, 18 Pa.B. 3434.