Current through Register Vol. 54, No. 45, November 9, 2024
Section 495.5 - Review of application(a) If, after review by the appropriate members of his staff, the application is approved by the District Engineer, it will be forwarded by the District Engineer to the Chief, Right-of-Way and Utilities Division, Bureau of Design, with copies to the Highway Quality Control Division and the Center for Program Development and Management, Bureau of Strategic Planning.(b) The Right-of-Way and Utilities Division will be responsible for obtaining approval from the Highway Quality Control Division and the Center for Program Development and Management, Bureau of Strategic Planning, and the Federal Highway Administration, if required.(c) If the proposed lease is approved by the aforesaid Bureaus, and, if required, by the Federal Highway Administration, the Right-of-Way and Utilities Division, with the assistance of the Office of Chief Counsel, will prepare a lease and forward it to the District Right-of-Way and Utilities Administrator for execution by the lessee.(d) Upon execution by the lessee, the lease will be returned by the District Right-of-Way and Utilities Administrator to the Chief, Right-of-Way and Utilities Division, Bureau of Design, for execution by a Deputy Secretary of Transportation.The provisions of this §495.5 adopted May 9, 1975, effective 5/10/1975, 5 Pa.B. 1230; amended November 10, 1978, effective 11/11/1978, 8 Pa.B. 3095; readopted August 5, 1988, effective 8/6/1988, 18 Pa.B. 3434.