Current through Register Vol. 54, No. 45, November 9, 2024
Section 473.10 - Standards, methods, techniques, designs and special conditions(a) The Department reserves the right to specify or make determinations as to the standards, methods, techniques, designs and dimensional criteria acceptable in projects funded by aviation development grants.(b) The Department may publish standard specifications for the construction of airport improvements funded by aviation development grants.(c) The Department reserves the right to require special conditions, performance criteria or site specifications other than those outlined in this chapter on a site specific or project specific basis for airport projects funded with aviation development grants, including but not limited to the following: (1) The sequencing or phasing of construction in a special manner.(2) The construction or demolition of other projects or structures.(3) The purchase of additional property.(4) The clearing of land.(5) The completion of certain preventive maintenance procedures at specified intervals.(6) The maintenance of a specified level of minimum available services.(7) The maintenance of the general grounds and property of a facility in an orderly, efficient and safe manner.(8) The acquisition of necessary permits or licenses from other Federal, State or local agencies.(d) Special conditions, performance criteria or site specifications which may be a condition of receipt of an aviation development grant will be set forth in the offer.(e) Failure to meet special conditions, performance criteria or site specifications may result in the withdrawal of the aviation development grant, disqualification from future consideration for an aviation development grant or declaration of a sponsor to be in default of the terms of an aviation development grant agreement.The provisions of this §473.10 adopted October 3, 1986, effective 10/4/1986, 16 Pa.B. 3693; readopted July 20, 1990, effective 7/21/1990, 20 Pa.B. 3982.