Current through Register Vol. 54, No. 45, November 9, 2024
Section 457.10 - Past performance report(a) The Secretary may require the District Engineer, the Inspector General or other designee to submit a confidential past performance report on a contractor performing work for the Department.(b) This report, and reports received from outside entities, shall be used in conjunction with the other past performance information for determining the past performance rating of the contractor which rating shall be considered in determining the classification of the contractor and his responsibility as a contractor. The past performance report shall include evaluation of a contractor's attitude and cooperation, equipment, organization and management, scheduling and work performance. Poor or unsatisfactory ratings for specific work classifications shall constitute justification for revoking classifications previously granted. A contractor who has an overall unsatisfactory rating on performance reports will not be prequalified. Reports shall be confidential.The provisions of this §457.10 adopted September 21, 1973, effective 9/22/1973, 3 Pa.B. 2133; amended April 13, 1979, effective 4/14/1979, 9 Pa.B. 1308; amended November 28, 1980, effective 11/29/1980, 10 Pa.B. 4470; amended April 11, 1997, effective 7/1/1997, 27 Pa.B. 1798.