55 Pa. Code § 2070.37

Current through Register Vol. 54, No. 44, November 2, 2024
Section 2070.37 - Priority scheduling in periods of peak demand

During periods of peak demand for transportation, counties and prime contractors shall require priority scheduling to assure transportation for all recipients when it is necessary rather than at the time requested.

55 Pa. Code § 2070.37