Current through Register Vol. 54, No. 49, December 7, 2024
In preparing the Annual Resource Planning Report required by this subchapter, each EDC shall use the current forms and schedules specified by the Commission, which shall include the following:
(1) ARPR 1-Historical and Forecast Energy Demand.(2) ARPR 2-Historical and Forecast Connected Peak Load.(3) ARPR 3-Historical and Forecast Number of Connected Customers.(4) ARPR 4-Historical and Forecast Peak Load and Energy.(5) ARPR 5-Existing Generating Capability.(6) ARPR 6-Future Generating Capability Installations, Changes and Removals.(7) ARPR 7-Projected Capacity and Demand.(8) ARPR 8-Qualifying Facility and Independent Power Production Facilities.(9) ARPR 9-Scheduled Imports and Exports.(10) ARPR 10-Summary of Demands, Resources and Energy for the Previous Year.(11) ARPR 11-Transmission Line Projection.(12) ARPR 12-Conservation and Loan Management Program Description.The provisions of this § 57.152 amended February 25, 2000, effective 2/26/2000, 30 Pa.B. 1129.The provisions of this § 57.152 amended under the Public Utility Code, 66 Pa.C.S. § § 501, 524, 1501, 1504 and 2809.