Current through Register Vol. 54, No.43, October 26, 2024
Section 283.106 - Soil erosion and sedimentation control plan(a) The applicant shall submit a plan to manage surface water and control erosion during all phases of construction and operation at the facility. The plan shall be based on the requirements of § 283.232 (relating to soil erosion and sedimentation control), Chapter 102 (relating to erosion and sediment control) and other applicable State and Federal requirements. Calculations indicating water quantities shall be based on the 24-hour precipitation event in inches to be expected once in 25 years.(b) The plan shall include fully dimensioned diversion ditches, indicating length, gradient and cross section for configuration by reach, and capacities for ditch volume by reach. The calculations which are necessary to support design and siting shall be included in the plan. This section cited in 25 Pa. Code § 284.310 (relating to application requirements).