25 Pa. Code § 279.232

Current through Register Vol. 54, No.43, October 26, 2024
Section 279.232 - Soil erosion and sedimentation control

The operator shall manage surface water and control erosion and sedimentation to:

(1) Divert surface water away from the storage area with measures and structures necessary to handle surface water flows based on a 25-year, 24-hour precipitation event, supported by written calculations and also comply with Chapter 102 (relating to erosion control and sediment control).
(2) Meet the requirements of Chapter 102 and Chapter 105 (relating to dam safety and waterway management).
(3) Prevent erosion to the maximum extent possible, including where possible, using revegetation.

25 Pa. Code § 279.232

The provisions of this §279.232 amended December 22, 2000, effective 12/23/2000, 30 Pa.B. 6685.

This section cited in 25 Pa. Code § 279.105 (relating to soil plan).