Current through Register Vol. 54, No.43, October 26, 2024
Section 279.102 - Operating plan(a) An application to operate a transfer facility shall contain a narrative description of the general operating plan for the proposed facility, including the origin, composition and weight or volume of solid waste that is proposed to be received at the facility, the process to be used at the facility, the daily operational methodology of the proposed process, the loading rate, the proposed capacity of the facility and the expected life of the facility.(b) An application shall contain a plan for an alternative waste handling or disposal system during periods when the proposed facility is not in operation, including procedures to be followed in case of equipment breakdown. Procedures may include the use of standby equipment, extension of operating hours and contractual agreements for diversion of municipal waste to other facilities.(c) An application shall contain a plan for training equipment operators and other personnel concerning the operation and approved design of the facility, including safety measures to prevent injuries.(d) An application shall contain a plan for assuring that solid waste received at the facility is consistent with § 279.201 (relating to basic limitations).(e) An application shall contain the proposed operating hours of the proposed facility.(f) An application shall contain a narrative describing the procedures for inspection and monitoring of incoming waste.The provisions of this §279.102 amended December 22, 2000, effective 12/23/2000, 30 Pa.B. 6685. This section cited in 25 Pa. Code § 284.210 (relating to application requirements).