Current through Register Vol. 54, No.43, October 26, 2024
(a) A person or municipality shall comply with this section and §§ 273.271-273.276 (relating to leachate treatment) if the person or municipality: (1) Receives a permit to operate a construction/demolition waste landfill after April 9, 1988, including a permit that results in the expansion of a facility permitted before April 9, 1988.(2) Received a permit to operate a construction/demolition waste landfill before April 9, 1988, for which a liner system is required under § 277.252 (relating to general limitations).(b) A person or municipality operating a construction/demolition waste landfill on April 9, 1988, that is not subject to subsection (a), but which is required by The Clean Streams Law (35 P. S. §§ 691.1-691.1001) and regulations thereunder to treat leachate, shall comply with this section and §§ 277.272-277.276 (relating to basic treatment methods; leachate transportation; leachate recirculation; leachate collection and storage; and leachate analysis and sludge handling) to the greatest extent practicable. This section cited in 25 Pa. Code § 271.113 (relating to closure plan); and 25 Pa. Code § 277.162 (relating to leachate treatment plan).