If required by the Department, the operator shall conduct groundwater monitoring that meets the requirements of §§275.521-275.528, or another plan for accurately monitoring groundwater that is approved in the permit.
25 Pa. Code § 275.416
This section cited in 25 Pa. Code § 275.411 (relating to general requirements).