The operator shall incorporate sewage sludge into the soil within 24 hours following surface application.
25 Pa. Code § 275.413
This section cited in 25 Pa. Code § 275.411 (relating to general requirements).
The operator shall incorporate sewage sludge into the soil within 24 hours following surface application.