If required by the Department, the operator shall conduct soil-pore water monitoring that meets the requirements of § 275.515(Reserved), or another plan for accurately monitoring soil-pore water that is approved in the permit.
25 Pa. Code § 275.316
This section cited in 25 Pa. Code § 275.311 (relating to general requirements).