Analyses of data required by this subchapter shall be submitted on a form provided by the Department within 60 days of sampling or 15 days after completion of analyses, whichever is sooner, unless the Department approves another time period in the permit.
25 Pa. Code § 273.285
This section cited in 25 Pa. Code § 271.113 (relating to closure plan); 25 Pa. Code § 273.152 (relating to water quality monitoring plan); 25 Pa. Code § 273.281 (relating to general requirements); 25 Pa. Code § 283.233 (relating to soil and groundwater monitoring); 25 Pa. Code § 285.112 (relating to design and operation); and 25 Pa. Code § 285.123 (relating to impoundments-general).