25 Pa. Code § 273.171

Current through Register Vol. 54, No.43, October 26, 2024
Section 273.171 - Gas monitoring and control plan
(a) An application shall include a gas monitoring and control plan under § 273.292 (relating to gas control and monitoring). The plan shall include the following:
(1) A plan to monitor and record offsite gas migration and gas accumulation on and off the site, including structures.
(2) Designs for a gas control system, indicating the location and scheduling of construction, and the design of vents, barriers, collection pipes, manifolds or other control measures that will be put in place.
(b) If the applicant decides to conduct gas recovery, the application shall also include the following:
(1) Drawings and a narrative detailing the location and design of the proposed gas recovery system and the major onsite components of the system, which shall be consistent with § 273.293 (relating to gas recovery).
(2) Plans and designs to address special storage, transportation, processing, treatment or disposal measures anticipated or required in the management of the generated gases, condensates or other residues.

25 Pa. Code § 273.171

This section cited in 25 Pa. Code § 273.131 (relating to basic requirements); 25 Pa. Code § 273.292 (relating to gas control and monitoring); and 25 Pa. Code § 273.293 (relating to gas recovery).