Current through Register Vol. 54, No.43, October 26, 2024
Section 269a.22 - Flood hazard areas(a) Surface impoundment, landfill and land treatment facilities may not be sited in the 100-year floodplain or a larger area that the flood of record has inundated.(b) Treatment and incineration facilities may not be sited in the 100-year floodplain or a larger area that the flood of record has inundated unless the industrial use on the proposed site was in existence as of October 4, 1978, which is the effective date of the Flood Plain Management Act (32 P. S. §§ 679.101-679.601). This section cited in 25 Pa. Code § 269a.12 (relating to phase I).