Current through Register Vol. 54, No.43, October 26, 2024
Section 265a.162 - Bond amount adjustmentsThe owner or operator shall deposit additional amounts of bond within 60 days of any of the following:
(1) The permit is amended to increase acreage, to change the kind of waste handled or for another reason that requires an additional amount of bond determined under 40 CFR 265.142 and 265.144 (relating to cost estimate for closure; and cost estimate for postclosure care).(2) Inflationary cost factors exceed the estimate used for the original bond amount determination under 40 CFR 265.142 and 265.144.(3) The permit is to be renewed or reissued, or the bond on deposit is to be replaced, requiring an additional amount of bond determined under 40 CFR 265.142 and 265.144.(4) An additional amount of bond is required as determined by 40 CFR 265.142 and 265.144 to meet the requirements of applicable statutes, this subchapter and the terms and conditions of the permit or orders of the Department. This section cited in 25 Pa. Code § 265a.153 (relating to requirement to file a bond); 25 Pa. Code § 265a.163 (relating to failure to maintain adequate bond); 25 Pa. Code § 265a.164 (relating to separate bond for a portion of a facility); and 25 Pa. Code § 265a.165 (relating to bond release).