Current through Register Vol. 54, No.43, October 26, 2024
Section 236.325 - Material performance monitoring(a) An analysis of the materials and components of the engineered structures shall be conducted to demonstrate that the disposal facility can perform through the long term care period.(b) The disposal facility design shall include provisions for a monitoring program which can provide ongoing verification of the performance of the engineered structure. At a minimum, the program shall provide performance verification beginning at initial operation and up to and including the active institutional control period. This section cited in 25 Pa. Code § 236.315 (relating to recoverability); 25 Pa. Code § 236.327 (relating to class C waste); 25 Pa. Code § 236.328 (relating to mixed waste); and 25 Pa. Code § 236.409 (relating to monitoring plan).