Current through Register Vol. 54, No. 45, November 9, 2024
This chapter requires owners of sewerage facilities to properly plan, manage and maintain sewerage facilities in a manner which will do the following:
(1) Anticipate and prevent overloading sewerage facilities.(2) Limit additional extensions and connections to an overloaded sewer system or a sewer system tributary to an overloaded plant.(3) Prevent the introduction into sewerage facilities of pollutants which will interfere with the operation of the plant or pass through or otherwise be incompatible with the treatment process or sewerage facility.(4) Improve opportunities to recycle and reclaim municipal and industrial wastewaters and sludges.The provisions of this §94.3 adopted November 4, 1977, effective 11/21/1977, 7 Pa.B. 3259; amended October 3, 1980, effective 10/4/1980, 10 Pa.B. 3917; amended February 26, 1988, effective upon delegation of the pretreatment program to the Department by the Environmental Protection Agency; amended September 4, 1998, effective 9/5/1998, 28 Pa.B. 4517.The provisions of this §94.3 issued under section 9 of the Pennsylvania Sewage Facilities Act (35 P. S. § 750.9); amended under section 5 of The Clean Streams Law (35 P. S. § 691.5); and section 1920-A of The Administrative Code of 1929 (71 P. S. § 510-20).