25 Pa. Code § 105.107

Current through Register Vol. 54, No. 36, September 7, 2024
Section 105.107 - Final inspection

Within 10 days after the completion of work on a dam authorized by the Department, the permittee or owner shall schedule a final project inspection with the Department. The final inspection must include the permittee or owner, the permittee or owner's supervising engineer, and the Department's field representative. Upon conclusion of this final inspection, the Department's field representative will present the permittee or owner with a list of any deficient items, if necessary. A follow-up final inspection may be required by the Department. At the discretion of the Department, the final inspection may be waived for projects authorized by Letter of Amendment or Letter of Authorization.

25 Pa. Code § 105.107

The provisions of this §105.107 adopted September 26, 1980, effective 9/27/1980, 10 Pa.B. 3843; amended January 7, 2011, effective 1/8/2011, 41 Pa.B. 219.

The provisions of this §105.107 amended under section 5 of the Dam Safety and Encroachments Act (32 P. S. § 693.5).

This section cited in 25 Pa. Code § 105.88 (relating to dam permit issuance); and 25 Pa. Code § 105.445 (relating to waiver of certain requirements).