Current through Register Vol. 54, No. 44, November 2, 2024
Section 90.304 - Application for authorization(a) An operator who requests authorization under this subchapter shall comply with the permit application requirements of Chapter 86 (relating to surface and underground coal mining: general) and Subchapters A-D, except as specifically modified by this subchapter. The operator shall also: (1) Delineate on a map the proposed pollution abatement area, including the location of the pre-existing discharges.(2) Provide a description of the hydrologic balance for the proposed pollution abatement area that includes: (i) Results of a detailed water quality and quantity monitoring program, including seasonal variations, variations in response to precipitation events and modeled baseline pollution loads using this monitoring program.(ii) Monitoring for flow, pH, alkalinity, acidity, total iron, total manganese, total aluminum, sulfates, total suspended solids and other water quality parameters the Department deems relevant.(3) Provide a pollution abatement plan which must: (i) Describe the pollution abatement area.(ii) Be designed to reduce the pollution load from pre-existing discharges and must identify the selected best management practices (BMP) to be used.(iii) Describe the design specifications, construction specifications, maintenance schedules, criteria for monitoring and inspection, and expected performance of the BMPs.(iv) Represent best technology and include: (A) Plans, cross-sections and schematic drawings describing the pollution abatement plan proposed to be implemented.(B) A description and explanation of the range of abatement level that is anticipated to be achieved, costs and each step in the proposed pollution abatement plan.(C) A description of the standard of success for revegetation necessary to insure success of the pollution abatement plan. (v) Provide a description of and information on the pre-existing discharges hydrogeologically connected to the remining area.(4) Determine the baseline pollution load.(5) Provide background data that are the bases for the baseline pollution load. The baseline pollution load shall be reported in pounds per day.(b) The operator seeking this authorization may continue the water quality and quantity monitoring program required by subsection (a)(2) after making the authorization request. The operator may submit the results of this continuing monitoring program to the Department on a monthly basis until a decision on the authorization request is made.The provisions of this §90.304 amended October 21, 2016, effective 10/22/2016, 46 Pa.B. 6780.The provisions of this §90.304 amended under section 5 of The Clean Streams Law (35 P.S. § 691.5); sections 4(a) and 4.2 of the Surface Mining Conservation and Reclamation Act (52 P.S. §§ 1396.4(a) and 1396.4b); and section 1920-A of The Administrative Code of 1929 (71 P.S. § 510-20).