The following words and terms, when used in this subchapter, have the following meanings, unless the context clearly indicates otherwise:
Actual improvement-The reduction of the baseline pollution load resulting from the implementation of the approved pollution abatement plan; except that any reduction of the baseline pollution load achieved by water treatment may not be considered as actual improvement provided that treatment approved by the Department of the coal refuse before, during or after placement in the coal refuse disposal area will not be considered to be water treatment.
Baseline pollution load-The characterization of the pollutional material being discharged from or on the pollution abatement area, described in terms of mass discharge for each parameter deemed relevant by the Department, including seasonal variations and variations in response to precipitation events. The Department will establish in each authorization the specific parameters it deems relevant for the baseline pollution load, including, at a minimum, iron and acid loadings.
Best professional judgment-The highest quality technical opinion forming the basis for the terms and conditions of the treatment level required after consideration of all reasonably available and pertinent data. The treatment levels shall be established by the Department under sections 301 and 402 of the Federal Clean Water Act (33 U.S.C.A. §§ 1311 and 1342).
Best technology-Measures and practices which will abate or ameliorate, to the maximum extent possible, discharges from or on the pollution abatement area. These measures include engineering, geochemical or other applicable practices.
Coal refuse disposal activities.
Coal remining operation-A coal mining operation at a site on which coal mining was previously conducted and where the site has been abandoned or the performance bond has been forfeited.
Encountered discharge-
Excess soil and related material-
Pollution abatement area-
Pollution abatement plan-Best management practices (BMP), including, but not limited to, the addition of alkaline material, special handling plans for managing toxic and acid forming material, regrading, revegetation and daylighting, that when implemented will result in reduction of the baseline pollution load.
Pre-existing discharge-
Steep slope-
25 Pa. Code § 90.302
The provisions of this §90.302 amended under section 5 of The Clean Streams Law (35 P.S. § 691.5); sections 4(a) and 4.2 of the Surface Mining Conservation and Reclamation Act (52 P.S. §§ 1396.4(a) and 1396.4b); and section 1920-A of The Administrative Code of 1929 (71 P.S. § 510-20).