25 Pa. Code § 90.163

Current through Register Vol. 54, No. 44, November 2, 2024
Section 90.163 - Prime farmland: soil stockpiling

If not utilized immediately, the A horizon specified in § 90.162(b) (relating to prime farmland: soil removal) and the B horizon or other suitable soil materials specified in § 90.162(c) and (d) shall be stored separately from each other and from spoil. These stockpiles shall be placed within the permit area where they are not disturbed or exposed to excessive water or wind erosion before the stockpiled horizons can be redistributed. Stockpiles in place for more than 30 days shall meet the requirements of § 90.98 (relating to topsoil: storage).

25 Pa. Code § 90.163

The provisions of this §90.163 adopted December 19, 1980, 10 Pa.B. 4789, effective 7/31/1982, 12 Pa.B. 2382; amended July 30, 1982, 12 Pa.B. 2473, effective 7/31/1982, 12 Pa.B. 2382.

This section cited in 25 Pa. Code § 86.159 (relating to self-bonding); 25 Pa. Code § 90.45 (relating to prime farmland); 25 Pa. Code § 90.125 (relating to coal refuse disposal: construction requirements); 25 Pa. Code § 90.151 (relating to revegetation: general requirements); and 25 Pa. Code § 90.161 (relating to prime farmland: special requirements).