Dams and embankments constructed of coal refuse or intended to impound coal refuse, whether they were completed before adoption of the regulatory program or are intended to be completed thereafter, shall meet the requirements of §§ 90.111-90.113, 90.120, 90.122, 90.124 and 90.125.
25 Pa. Code § 90.130
The provisions of this §90.130 amended under the Surface Mining Conservation and Reclamation Act (52 P. S. §§ 1396.1-1396.19a); The Clean Streams Law (35 P. S. §§ 691.1-691.1001); and section 1920-A of The Administrative Code of 1929 (71 P. S. § 510-20).
This section cited in 25 Pa. Code § 90.39 (relating to ponds, impoundments, banks, dams, embankments, piles and fills).