At the completion of surface mining activities, the person who conducts the surface mining activities shall renovate as required by the Department all permanent sedimentation ponds, diversions, impoundments and treatment facilities to meet criteria specified in the detailed design plan for the permanent structures and impoundments.
25 Pa. Code § 88.108
This section cited in 25 Pa. Code § 88.381 (relating to general requirements).