An application shall contain a blasting plan for the proposed permit area, explaining how the applicant intends to comply with the requirements of Subchapter B, C or D (relating to surface anthracite coal mines: minimum environmental protection performance standards; anthracite bank removal and reclamation: minimum environmental protection performance standards; and anthracite refuse disposal: minimum environmental protection performance standards).
25 Pa. Code § 88.45
This section cited in 25 Pa. Code § 88.41 (relating to operation plan: requirements); and 25 Pa. Code § 88.493 (relating to minimum environmental protection performance standards).