25 Pa. Code § 78.83c

Current through Register Vol. 54, No. 44, November 2, 2024
Section 78.83c - Intermediate and production casing
(a) Prior to cementing the intermediate and production casing, the borehole, mud and cement shall be conditioned to ensure an adequate cement bond between the casing and the formation.
(b) If the well is to be equipped with an intermediate casing, centralizers shall be used and the casing shall be cemented to the surface by the displacement method. Gas may be produced off the intermediate casing if a shoe test demonstrates that all gas will be contained within the well and a relief valve is installed at the surface that is set less than the shoe test pressure. The shoe test pressure shall be recorded in the completion report.
(c) Except as provided in § 78.83 (relating to surface and coal protective casing and cementing procedures), each well must be equipped with production casing. The production string may be set on a packer or cemented in place. If the production casing is cemented in place, centralizers shall be used and cement shall be placed by the displacement method with sufficient cement to fill the annular space to a point at least 500 feet above true vertical depth or at least 200 feet above the uppermost perforations, whichever is greater.

25 Pa. Code § 78.83c

The provisions of this §78.83c adopted February 4, 2011, effective 2/5/2011, 41 Pa.B. 805.