25 Pa. Code § 76.63

Current through Register Vol. 54, No. 36, September 7, 2024
Section 76.63 - Interim and final reports
(a) The development agency shall submit the following reports for a demonstration project:
(1)Interim reports. Interim report schedules and content shall be established in the grant agreement.
(2)Final report. The final report shall be submitted in draft form at least 90 days prior to the end of the approved project period and shall contain the following:
(i) Documentation of project activities over the entire period of grant support.
(ii) Description of the development agency achievements with respect to stated project purposes and objectives.
(iii) Technical aspects of the project, both negative and positive, in complete detail.
(iv) The findings, conclusions and results of the agency, including, when applicable, an evaluation of the technical effectiveness, environmental effects and economic feasibility of methods and techniques demonstrated.
(b) Prior to the end of the project period, after review and comment on the draft report by the Department, the development agency shall submit one reproducible copy suitable for printing of the final report to the Department, which shall include changes or additional information applicable to the project that the Department may have required upon review of the draft final report.

25 Pa. Code § 76.63

The provisions of this §76.63 adopted January 30, 1976, effective 2/16/1976, 6 Pa.B. 157.