Or. Admin. Code § 918-550-0600

Current through Register Vol. 63, No. 12, December 1, 2024
Section 918-550-0600 - Trip Permit Requirements
(1) A trip permit is required to move a manufactured structure from one location to another unless exempted under ORS 446.631 & 446.646. A person desiring a trip permit to move a manufactured structure shall submit a completed division approved form and a county tax certification form to the division.
(2) The county tax certification form submitted pursuant to (1) must be signed by an authorized representative of the appropriate county.
(3) The county tax certification form submitted pursuant to (1) is only valid until the expiration date indicated on the form.
(4) The expiration date for a trip permit is either the same date as indicated on the county tax certification form or 30 days after issuance of the trip permit, whichever is sooner.
(5) In the case of a multiple-unit-manufactured structure, a trip permit is required for each unit. The manufactured structure trip permit fee, as provided in ORS 446.631 & 446.646 is required for each permit issued.
(6) An issued trip permit is valid for a single move from one situs to another as indicated on the permit, and only until the expiration date as determined by subsection (4).
(7) A trip permit is valid for the owner of the structure and transporter listed on the permit.
(8) A permit may not be transferred to any person or a different manufactured structure.
(9) A trip permit issued by the division is not required to move a new manufactured structure to a destination outside of Oregon. However, a trip permit is required if a manufactured structure is being moved out of state, if the structure currently has an ownership document, or is exempt under ORS 446.

Or. Admin. Code § 918-550-0600

BCD 10-2005, f. 4-29-05, cert. ef. 5-1-05; BCD 2-2017(Temp), f. 1-31-17, cert. ef. 2-1-17 thru 7-30-17; BCD 8-2017, f. 7-28-17, cert. ef. 7/31/2017

Stat. Auth.: ORS 446.631

Stats. Implemented: ORS 446.631, 446.636 & 446.646