Current through Register Vol. 63, No. 12, December 1, 2024
Section 918-050-0130 - Statewide Fee Methodologies for Manufactured Home Siting Permits(1) A municipality shall charge a single fee for the installation and setup of manufactured homes. This fee shall include the concrete slab, runners or foundations when they comply with the prescriptive requirements of the Oregon Manufactured Dwelling and Park Specialty Code, electrical feeder and plumbing connections and all cross-over connections.(2) Decks, other accessory structures and foundations that do not comply with the prescriptive requirements of the Oregon Manufactured Dwelling and Park Specialty Code, utility connections beyond 30 lineal feet, new electrical services or additional branch circuits, new plumbing, and other such items that fall under the building code may require separate permits.(3) When a municipality has reason to believe that the existing electrical service to a manufactured dwelling may be unsafe or inadequate, the municipality may require a separate permit to inspect the electrical service.Or. Admin. Code § 918-050-0130
BCD 9-2000, f. 6-15-00, cert. ef. 10-1-00; BCD 26-2000(Temp), f. 10-4-00, cert. ef. 1-1-01 thru 6-29-01; BCD 31-2000, f. 12-27-00, cert. ef. 1-1-01; BCD 31-2005, f. 12-30-05, cert. ef. 1-1-06; BCD 27-2008, f. ef.12-12-08, cert. ef. 1-1-09Publications: Publications referenced are available from the agency.
Stat. Auth.: ORS 455.048 & 455.055
Stats. Implemented: ORS 455.046 & 455.055