Fees for plan review and permits issued by the Division for construction, alteration and repair of prefabricated structures and of buildings and other structures as established by these rules and authorized by ORS 455.210, shall be determined by using the value for estimated construction cost as 83 percent of the value shown on the construction valuation table established April 1, 2001, and published by the International Conference of Building Officials (ICBO), amended to include pole buildings not shown on the ICBO table, and to use the alternative (good) value for dwellings and apartment houses. A copy of the amended table, adjusted for Oregon, is printed in its entirety in Table 1-S. The valuation for plan review of buildings whose occupancies and types of buildings not listed in the valuation table shall be established at the actual project cost, including profit and overhead.
[NOTE: Table referenced is not included in rule text.]
Or. Admin. Code § 918-460-0030
To view tables referenced in rule text, click here to view rule.
Statutory/Other Authority: ORS 455.210
Statutes/Other Implemented: ORS 455.210